We establish explicit socially optimal rules for an irreversible investment decision with time-to-build and uncertainty. Assuming a price sensitive demand function with a random intercept, we provide comparative statics and economic interpretations for three models of demand (arithmetic Brownian, geometric Brownian, and the Cox-Ingersoll-Ross). Committed capacity, that is, the installed capacity plus the investment in the pipeline, must never drop below the best predictor of future demand, minus two biases. The discounting bias takes into account the fact that investment is paid upfront for future use; the precautionary bias multiplies a type of risk aversion index by the local volatility. Relying on the analytical forms, we discuss in detail the economic effects. For example, the impact of volatility on the optimal investment is negligible in some cases. It vanishes in the CIR model for long delays, and in the GBM model for high discount rates. © 2014 Elsevier B.V.

René, A., Federico, S., Pham, H., Villeneuve, B. (2015). Explicit investment rules with time-to-build and uncertainty. JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 51, 240-256 [10.1016/j.jedc.2014.10.010].

Explicit investment rules with time-to-build and uncertainty

René Aïd;Salvatore Federico;
2015-01-01

Abstract

We establish explicit socially optimal rules for an irreversible investment decision with time-to-build and uncertainty. Assuming a price sensitive demand function with a random intercept, we provide comparative statics and economic interpretations for three models of demand (arithmetic Brownian, geometric Brownian, and the Cox-Ingersoll-Ross). Committed capacity, that is, the installed capacity plus the investment in the pipeline, must never drop below the best predictor of future demand, minus two biases. The discounting bias takes into account the fact that investment is paid upfront for future use; the precautionary bias multiplies a type of risk aversion index by the local volatility. Relying on the analytical forms, we discuss in detail the economic effects. For example, the impact of volatility on the optimal investment is negligible in some cases. It vanishes in the CIR model for long delays, and in the GBM model for high discount rates. © 2014 Elsevier B.V.
2015
René, A., Federico, S., Pham, H., Villeneuve, B. (2015). Explicit investment rules with time-to-build and uncertainty. JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 51, 240-256 [10.1016/j.jedc.2014.10.010].
File in questo prodotto:
File Dimensione Formato  
Salvatore Explicit investment rules.pdf

accesso aperto

Tipologia: PDF editoriale
Licenza: PUBBLICO - Pubblico con Copyright
Dimensione 1.95 MB
Formato Adobe PDF
1.95 MB Adobe PDF Visualizza/Apri

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11365/1003435