This paper addresses an allocation and sequencing problem motivated by an application in unsupervised automated manufacturing. There are n independent jobs to be processed by one of m machines or units during a finite unsupervised duration or shift. Each job is characterized by a certain success probability p_i , and a reward r_i which is obtained if the job is successfully carried out. When a job fails during processing, the processing unit is blocked, and the jobs subsequently scheduled on that machine are blocked until the end of the unsupervised period. The problem is to assign and sequence the jobs on the machines so that the expected total reward is maximized. This paper presents the following results for this problem and some extensions: (i) a polyhedral characterization for the single machine case, (ii) the proof that the problem is NP-hard even with 2 machines, (iii) approximation results for a round-robin heuristic, (iv) an effective upper bound. Extensive computational results show the effectiveness of the heuristic and the bound on a large sample of instances.
Agnetis, A., Detti, P., Pranzo, M., Sodhi, M. (2009). Sequencing unreliable jobs on parallel machines. JOURNAL OF SCHEDULING, 12, 45-54 [10.1007/s10951-008-0076-6].
Sequencing unreliable jobs on parallel machines
AGNETIS, ALESSANDRO;DETTI, PAOLO;PRANZO, MARCO;
2009-01-01
Abstract
This paper addresses an allocation and sequencing problem motivated by an application in unsupervised automated manufacturing. There are n independent jobs to be processed by one of m machines or units during a finite unsupervised duration or shift. Each job is characterized by a certain success probability p_i , and a reward r_i which is obtained if the job is successfully carried out. When a job fails during processing, the processing unit is blocked, and the jobs subsequently scheduled on that machine are blocked until the end of the unsupervised period. The problem is to assign and sequence the jobs on the machines so that the expected total reward is maximized. This paper presents the following results for this problem and some extensions: (i) a polyhedral characterization for the single machine case, (ii) the proof that the problem is NP-hard even with 2 machines, (iii) approximation results for a round-robin heuristic, (iv) an effective upper bound. Extensive computational results show the effectiveness of the heuristic and the bound on a large sample of instances.File | Dimensione | Formato | |
---|---|---|---|
sequencing unreliable jobs on parallel machines.pdf
non disponibili
Tipologia:
Post-print
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
370.93 kB
Formato
Adobe PDF
|
370.93 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11365/2489
Attenzione
Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo