This paper addresses a problem arising in the coordination between two consecutive manufacturing departments of a production system, in which parts are processed in batches, and each batch is characterized by two distinct attributes. Due to limited interstage buffering between the two stages, the two departments have to follow the same batch sequence. In the first department, a setup occurs every time the first attribute of the new batch is different from the previous one. In the downstream department, there is a setup when the second attribute of the new batch changes. The problem consists of finding a common batch sequence optimizing some global utility index. Here we propose a metaheuristic approach to a bi-criteria version of the problem considering two indices, namely the total number of setups paid for by the two departments and the maximum number of setups paid for by either department.

Detti, P., Meloni, C., Pranzo, M. (2007). Minimizing and balancing setups in a serial production system. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 45(24), 5769-5788 [10.1080/00207540701636306].

Minimizing and balancing setups in a serial production system

DETTI, PAOLO;PRANZO, MARCO
2007-01-01

Abstract

This paper addresses a problem arising in the coordination between two consecutive manufacturing departments of a production system, in which parts are processed in batches, and each batch is characterized by two distinct attributes. Due to limited interstage buffering between the two stages, the two departments have to follow the same batch sequence. In the first department, a setup occurs every time the first attribute of the new batch is different from the previous one. In the downstream department, there is a setup when the second attribute of the new batch changes. The problem consists of finding a common batch sequence optimizing some global utility index. Here we propose a metaheuristic approach to a bi-criteria version of the problem considering two indices, namely the total number of setups paid for by the two departments and the maximum number of setups paid for by either department.
2007
Detti, P., Meloni, C., Pranzo, M. (2007). Minimizing and balancing setups in a serial production system. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 45(24), 5769-5788 [10.1080/00207540701636306].
File in questo prodotto:
File Dimensione Formato  
ijprDettiMeloniPranzo.pdf

non disponibili

Tipologia: Post-print
Licenza: NON PUBBLICO - Accesso privato/ristretto
Dimensione 202.74 kB
Formato Adobe PDF
202.74 kB Adobe PDF   Visualizza/Apri   Richiedi una copia

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/11365/21960
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo