In this paper, we consider an integrated production and outbound delivery scheduling problem. In particular, we address the situation in which the scheduling sequence and the delivery sequence are the same and predefined. A set of jobs are processed on a single machine, and finished jobs are delivered to the customers by a single capacitated vehicle. Each job has a processing time, and transportation times between customers are taken into account. Because the sequence is given, the problem consists in forming batches of jobs and our objective is to minimize the sum of the delivery times or general functions of the delivery times. The NP-hardness of the general problem is established, and a pseudopolynomial time dynamic programming algorithm is given. Some particular cases are treated, for which NP-hardness proofs and polynomial time algorithms are given. Finally, a fixed-parameter tractability result is given.
Cheref, A., Agnetis, A., Artigues, C., Billaut, J. (2017). Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence. JOURNAL OF SCHEDULING, 20(6 (special issue)), 681-693 [10.1007/s10951-017-0540-2].
Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
Agnetis, Alessandro;
2017-01-01
Abstract
In this paper, we consider an integrated production and outbound delivery scheduling problem. In particular, we address the situation in which the scheduling sequence and the delivery sequence are the same and predefined. A set of jobs are processed on a single machine, and finished jobs are delivered to the customers by a single capacitated vehicle. Each job has a processing time, and transportation times between customers are taken into account. Because the sequence is given, the problem consists in forming batches of jobs and our objective is to minimize the sum of the delivery times or general functions of the delivery times. The NP-hardness of the general problem is established, and a pseudopolynomial time dynamic programming algorithm is given. Some particular cases are treated, for which NP-hardness proofs and polynomial time algorithms are given. Finally, a fixed-parameter tractability result is given.File | Dimensione | Formato | |
---|---|---|---|
Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence.pdf
non disponibili
Tipologia:
PDF editoriale
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
624.66 kB
Formato
Adobe PDF
|
624.66 kB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11365/1033513