The general objective of the chapter is to briefly comment on the performance cycle regulated by art. 4 of the legislative decree no. 150/2009. In doing so, first of all the theme of performance measurement and evalutation is framed within the broader and more complex framework of the managerial reforms of public administrations. Subsequently, the technical profiles of the dictation of article 4 are taken into consideration. Finally, brief technical considerations are placed at the end of the chapter.
Mussari, R., Ruggiero, P. (2010). Il ciclo di gestione della performance. In La riforma del lavoro pubblico (pp. 63-71). Rimini : EDK Editore.
Il ciclo di gestione della performance
MUSSARI, RICCARDO;RUGGIERO, PASQUALE
2010-01-01
Abstract
The general objective of the chapter is to briefly comment on the performance cycle regulated by art. 4 of the legislative decree no. 150/2009. In doing so, first of all the theme of performance measurement and evalutation is framed within the broader and more complex framework of the managerial reforms of public administrations. Subsequently, the technical profiles of the dictation of article 4 are taken into consideration. Finally, brief technical considerations are placed at the end of the chapter.File | Dimensione | Formato | |
---|---|---|---|
Il ciclo di gestione della performance.pdf
non disponibili
Tipologia:
PDF editoriale
Licenza:
NON PUBBLICO - Accesso privato/ristretto
Dimensione
4.35 MB
Formato
Adobe PDF
|
4.35 MB | Adobe PDF | Visualizza/Apri Richiedi una copia |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.
https://hdl.handle.net/11365/2576